George Bush Intercontinental Airport’s Terminal D, Minutes away from Humble, is moving forward with a “dramatic new vision ” — The existing structure will remain operational throughout the renovation project, but the end result will be a thorough list of aesthetic and operational changes that impact virtually every corner of the terminal building
Proposed Terminal D Renderings
On April 24, 2014, Houston Aviation Director Mario Diaz presented members of Houston’s City Council with a dramatic new vision of the Mickey Leland International Terminal building (Terminal D) at George Bush Intercontinental Airport. The plan calls for the construction of a completely new gateway terminal facility, on the exact site of the existing Terminal D facility.To see high resolution images of the proposed renderings of the new Mickey Leland Terminal D facility at George Bush Intercontinental Airport, click on each thumbnail below